The composition of this pontoon is unique. First, because the formation consists of 9 innovative VSP770 pontoons.

Van Schie_Journaal_najaar 2021_grondwerk_voorboren_pontons (34)

Second, because the platform as formed here is certified as a whole, including the sounding system and the dinghy. Third, because the entire deck can be used for operations.

No space is taken up by winches and cables because the new winches are one with the spud poles.

Want to stay informed?

Sign up for our newsletter